List of documents
- Revised Programme for Stage 3 of A5 DUAL CARRIAGEWAY SCHEME PUBLIC INQUIRY
- Selected Statutes; Case Law; Scheme Documents and Reference Documents (Word 38 KB)
2022 Outline Business Case
01. Design and construction contracts for Sections 1, 2 and 3 of the scheme
- Section 3 Lot 3 Contract Award (PDF 141 KB)
- Section 2 Lot 2 Contract Award (PDF 141 KB)
- Section 1 Volume 3 Site Information Final (PDF 155 KB)
- Section 1 Volume 2 Part 2 Works Information Final (PDF 136 KB)
- Section 1 Volume 2 Part 2 Appendix 1 Overall Delivery Programme (PDF 105 KB)
- Section 1 Volume 2 Part 1 Scope of Services (PDF 117 KB)
- Section 1 Volume 2 Part 1 Appendix 2 Programme (PDF 126 KB)
- Section 1 Volume 1 Part 2 NEC3 ECC Option C Contract Documents (PDF 259 KB)
- Section 1 Volume 1 NEC3 PSC Contract Documents (PDF 1.8 MB)
- Section 1 Lot 1 1 Contract Award
02. Correspondence relating to conservation action plan for the McKean’s Moss
- 2021-10-05_TG-NIEA CDP_A5WTC McKean's Moss ASSI Mgmt Plan Consultation (PDF 681 KB)
- A5WTC_NIEA Consultation on McKean's Moss ASSI (PDF 189 KB)
- NIEA CDP_A5WTC McKean's Moss ASSI Mgmt Plan Consultation_14_04_23 (PDF 1.1 MB)
- RE_ 2021-10-05_TG-NIEA CDP_A5WTC McKean's Moss ASSI Mgmt Plan Consultation (2) (PDF 970 KB)
- RE_ 2021-10-05_TG-NIEA CDP_A5WTC McKean's Moss ASSI Mgmt Plan Consultation (PDF 967 KB)
- RE_ 2021-11-23_TG-CL (NIEA)_A5WTC McKean's Moss ASSI Mgmt Plan Consultation (PDF 1005 KB)
- RE_ Request for Habitat RAC Guidance documents (PDF 941 KB)
03. Excavation license AE 13 61 relating to the Sollus A archaeological site
- A5WTC AE-13-61 Sollus Final Report_June_2016 (PDF 10.2 MB)
- Sollus A Excavation Licence (PDF 220 KB)
- Sollus A Method Statement (PDF 1.1 MB)
04. Geophysical Survey and Trial Trenching Reports
- A5WTC Section 3 evaluation report_July_2013_Part5 (PDF 39.8 MB)
- A5WTC Section 3 evaluation report_July_2013_Part4 (PDF 32.9 MB)
- A5WTC Section 3 evaluation report_July_2013_Part3 (PDF 35.5 MB)
- A5WTC Section 3 evaluation report_July_2013_Part2 (PDF 39.4 MB)
- A5WTC Section 3 evaluation report_July_2013_Part1 (PDF 35.5 MB)
- Section 3 - 120112-2746-3 (PDF 17.2 MB)
- Section 2 - 170112-2746-2 (PDF 21.5 MB)
- A5WTC Section 1 evaluation report_June_2013_Part5 (PDF 33.1 MB)
- A5WTC Section 1 evaluation report_June_2013_Part4 (PDF 38.9 MB)
- A5WTC Section 1 evaluation report_June_2013_Part3 (PDF 37.6 MB)
- A5WTC Section 1 evaluation report_June_2013_Part2 (PDF 33.8 MB)
- A5WTC Section 1 evaluation report_June_2013_Part1 (PDF 39.8 MB)
- Section 1 - 200112-2746-1 (PDF 21.4 MB)
05. Errigal Keerogue Files
- SM7-TYR-059-006-09 (PDF 40 KB)
- SM7-TYR-059-006-08 (PDF 1.7 MB)
- SM7-TYR-059-006-07 (PDF 3.2 MB)
- SM7-TYR-059-006-06-ANN HAMLIN THESIS (PDF 477 KB)
- SM7-TYR-059-006 (PDF 22.1 MB)
- Note on Errigal Keerogue status (Word 148 KB)
- Errigal Keerogue extents (PDF 140 KB)
06. Memorandum dated 18th March 2021 - Process for Flood Risk Assessment
07. The 2022 Outline Business Case (OBC 2022)
08. The Project Team’s latest assessment of Risk 9 on the risk register for the scheme
09. Expanding the Strategic Road Improvement Programme 2015
10. Substandard stretches of the existing A5 referred to in Paragraph 5 of the Department’s Theme Report 8
11. Documents relating to the Executive’s commitment to deliver Phase 1a of the scheme first and by the fourth quarter of 2026